PRC DEMOLITIONA Division of PRC Builders

← Commercial Demolition

Site Clearing & Site Prep

Site Clearing & Site Prep Contractor in Milford & Southern Connecticut

Before a new building goes up, everything that's there has to come out: structures, slabs, paving, footings and old utilities. We clear commercial sites from our base in Milford and hand them over ready for the site contractor or builder.

  • CT Licensed — DMCR.003450
  • $2M Insured
  • 5.0★ Google Rating
Cleared and graded lot after PRC demolition on the Post Road in Milford, CT

Who This Is For

You're in the right place.

For developers and owners preparing land for new construction, general contractors who want the site handed over clean, and municipalities clearing blighted parcels.

What’s Included

  • Building and outbuilding demolition up to 2½ stories
  • Slab, footing and foundation removal
  • Parking lot and paving removal
  • Utility disconnects and caps coordinated with each utility and sewer authority
  • Underground storage tank removal coordinated with the Fire Marshal's permit
  • Backfill, compaction and rough grading
  • Clean concrete, brick and rock reused as on-site fill where the rules allow
  • Erosion and sediment controls installed and maintained

Sequence

From standing building to buildable pad.

1. Survey & notices

Asbestos inspection, the state DPH and EPA demolition notices, and any local delay ordinance handled before mobilization.

2. Utilities & mark-outs

Every utility certifies its disconnect, sewer laterals are capped under the local authority's permit, and Call Before You Dig marks the site.

3. Demolition

Structures down, debris sorted, and metals and clean masonry separated from mixed C&D for recycling.

4. Foundations & paving

Slabs, footings, foundations and paving broken out and removed, or left in place where your engineer wants them.

5. Backfill & grade

Holes filled and compacted, the site rough-graded, and erosion controls left in place for the next contractor.

Rules That Shape Site Work

The thresholds that trigger extra permits.

  • DEEP's construction stormwater general permit, reissued January 1, 2026, applies at 1 acre of disturbance. From 1 to under 5 acres, local approval satisfies it; at 5 acres or more, the project also registers with the state and needs a Stormwater Pollution Control Plan.
  • Local erosion and sediment control plans kick in at half an acre of disturbance in Trumbull, Fairfield, Stratford, Shelton and West Haven. West Haven also triggers one at 800 cubic yards moved.
  • Shelton requires notice to abutting owners 48 hours before removing more than 200 cubic yards. Stratford requires a special permit to remove more than 50 cubic yards from any 10,000 square feet, unless it's surplus from work under a building permit.
  • Clean concrete, brick and rock can be reused on site as fill under DEEP rules, though crushing it may need an air permit. Shelton caps fill pieces at one cubic yard. Land-clearing debris can't be buried on site, and treated wood can't be buried, burned or mulched.
  • In coastal-area towns, coastal site plan review attaches to the redevelopment approvals for parcels inside the coastal boundary.

Active Sites

Where sites are being cleared.

Redevelopment is clearing sites all along our service area: Post Road pads in Milford and Orange, the former Army Engine Plant on Stratford's waterfront, the former PSEG plant and city blight sites in Bridgeport, and Commerce Drive near the Fairfield Metro station.

Milford →Stratford →Bridgeport →Fairfield →Slab & paving removal →

Why a Licensed Contractor Matters

Site work touches utilities, neighbors and the public right-of-way. We work under an active Connecticut demolition license (DMCR.003450) with $2M in coverage, call in Call Before You Dig before any breaking or digging, and document every load that leaves the site.

See our licenses & insurance →

Questions

Straight answers.

Do you do site prep in Milford?

Yes. We're based at 93 Boston Post Road in Milford, so Milford sites are the shortest drive we have. We clear sites across Fairfield and New Haven counties as well.

Does our project need a stormwater permit?

If it disturbs 1 acre or more, yes. DEEP's construction stormwater general permit was reissued January 1, 2026. Projects from 1 to under 5 acres are covered through local approval; at 5 acres or more, the project also registers with the state.

Can demolished concrete be used as fill on site?

Clean concrete, brick and rock can be, under DEEP rules, though crushing it may need an air permit and some towns limit piece size. Shelton caps it at one cubic yard per piece. Contaminated or mixed debris has to go to a permitted facility.

Can trees and stumps be buried on site?

No. DEEP rules don't allow land-clearing debris to be buried on site, so it's hauled out with the rest of the debris.

Do you remove underground storage tanks?

We coordinate tank removal under the Fire Marshal's permit. Some towns are specific: Stratford requires two weeks' notice, the Fire Marshal on site and witnessed soil sampling.

The PRC Standard

Professional from first call to final grade.

Every project runs through the same disciplined process: a single point of contact, a written scope, scheduled milestones, and a documented site handoff. Calls and quote requests are returned within two business hours.

Project Line

(203) 909-8639
Hours
Mon–Fri 7am–5pm · Sat 8am–2pm
Headquarters
93 Boston Post Road, Milford, CT
Response
Within 2 business hours

Fast Quotes · Fully Licensed

Get your site clearing & site prep quote.

Send photos and a few details — most quotes go out within 24 hours.

CT Demolition License DMCR.003450 · $2M liability coverage

Call NowGet a Fast Quote